22 February 2011 Trail Dynamics on Munson
After an up home break, the guys were back at it today on sections of 42-E and 43-E, aka the West Connector. As I arrived, a weld broke on a plate holding the 650's tamper attachment hydraulics. Result - afternoon cut short. I went ahead and snapped some shots of the work Hector, EZ, Cristino, Marco and Ed had done.
This gallery begins and ends with signs from the parking area depicting closing of the northern 5M of the paved trail beginning 23 Feb '11.
Download and read Valerie Naylor's trail assessment. See p.43 (of 55) in that pdf for Munson repair/reclaim segment number location; p.45-47 for description of letter codes A-G.
Optional experimental link to the same file. Please let me know if you have any trouble accessing the file via that experimental link.
More Munson info/links here.
THIS SITE is private property, and doesn't necessarily represent any other individual or organization. You are welcome to download/use my photos for your private enjoyment, including printing them. Any other usage/linking must come from me in writing (email ok), with credit given.
Questions, pre-scoldings, comments, ID, complaints?
Thanks,
John Kalin
Email me
"If I fall you're going down with me" - Trail running advice from my Dixie Chicks
http://www.tallahasseetrails.com/
Read More