11-12 March 2011 Trail Dynamics on Munson
After wrapping up the rain shortened work at 19-D, the guys leapfrogged over to work on sections 38-A and 37-D, south of Racetrack Pond. A dozen photos from the next day (12 March) posted beginning here. Later that Saturday, Hector, Marco, Ed and I got a ride in on Munson and TZ.
Download and read Valerie Naylor's trail assessment. See p.43 (of 55) in that pdf for Munson repair/reclaim segment number location; p.45-47 for description of letter codes A-G.
Optional experimental link to the same file. Please let me know if you have any trouble accessing the file via that experimental link.
More Munson info/links here.
THIS SITE is private property, and doesn't necessarily represent any other individual or organization. You are welcome to download/use my photos for your private enjoyment, including printing them. Any other usage/linking must come from me in writing (email ok), with credit given.
Questions, pre-scoldings, comments, ID, complaints?
Thanks,
John Kalin
Email me
"If I fall you're going down with me" - Trail running advice from my Dixie Chicks
http://www.tallahasseetrails.com/
Read More